CORSIA eligible units for 2027–2029: which units airlines can use, and the conditions

By VPA India · Published and facts checked 28-Nov-2026

CORSIA's second phase starts on 1 January 2027, with a compliance period from 2027 to 2029. For that period, ICAO's list of April 2026 names four programmes – ACR, ART, Gold Standard and Verra's VCS – and in November 2026 the ICAO Council approved four more: the BioCarbon Fund ISFL, the FCPF, Isometric and Premium T-VER. It also conditionally approved the Article 6.4 mechanism (PACM). Only units for reductions from 2021 to 2029, from activities whose first crediting period began in 2016 or later, with the host country's attestation, count – and each programme has exclusions. Our CORSIA page explains how we source eligible units and check projects.

Key points

  • Period. The 2027–2029 compliance period of CORSIA's second phase.
  • Programmes. Eight programmes approved for 2027–2029; ICAO's technical body is assessing seven more, with recommendations expected for the Council in spring 2027.
  • Dates. Reductions from 1 January 2021 to 31 December 2029, from activities whose first crediting period started on or after 1 January 2016.
  • Authorisation. Units for reductions from 2021 need the host country's attestation for use in CORSIA.
  • Corresponding adjustment. Gold Standard and VCS units also need the adjustment applied and shown in the host country's biennial transparency report, or a guarantee approved by the programme.
  • PACM. Conditionally approved for both phases; its registry was not yet operating when ICAO's technical body assessed it.

Who offsets in the second phase

The States whose routes are covered are listed in ICAO's document "CORSIA States for Chapter 3 State Pairs"; the edition that applies from 1 January 2027 was published in July 2026. A State is included if its share of international revenue tonne-kilometres in 2018 was above 0.5%, or if it is among the States that together make up 90% of the total. Least developed countries, small island developing States and landlocked developing countries are left out of these thresholds, unless they volunteer.

Exclusions by programme

  • Verra (VCS). Excluded, among others: units from activities that have not reported their sustainable development contributions (under CCB or SD VISta); grid-connected renewable power above 15 MW; most engineered removals; non-renewable biomass calculated with the CDM's TOOL 30; and project-level REDD+ above 7,000 VCUs a year in REDD+ countries, with exceptions.
  • Gold Standard. Excluded, among others: planned emission reductions; micro-scale units without validation and verification by an accredited entity; the land use, forestry and agriculture categories, with exceptions; grid-connected renewable power above 15 MW; engineered removals; and non-renewable biomass calculated with TOOL 30.
  • ACR. Excluded, among others: California and Washington offset credits; REDD+ above 7,000 ERTs a year; and units without the host country's attestation.
  • ART. Excluded: units without the host country's attestation, and units whose baselines have not been shown to be below business as usual.
  • All four. Units from methodologies whose baselines have not been shown, in public information, to be below business as usual.

What airlines and buyers should check

  • Programme and period. Is the programme approved for 2027–2029, not only for 2024–2026?
  • Vintage and start date. Reductions from 2021 to 2029; first crediting period from 2016.
  • Attestation. The host country's letter or attestation for use in CORSIA, for the specific units.
  • Adjustment. For Gold Standard and VCS units, the corresponding adjustment in the host country's transparency report, or a programme guarantee.
  • Exclusions. The methodology and project type against the programme's list of exclusions.
  • Label. The programme's CORSIA label or tag on the units in its registry, where it issues one.

What it means for you

  • Airlines. Buy for 2027–2029 only from approved programmes, and keep the evidence for each unit's attestation and adjustment.
  • Project developers in India. Plan for the host-country authorisation early; without it, units do not count. Large grid renewable projects, TOOL 30 cookstove projects and most land-use units under Gold Standard are excluded.
  • Holders of first-phase units. A unit eligible for 2024–2026 is not automatically eligible for 2027–2029; check it against the second-phase list.

How VPA India helps

  • Screening. We check units and projects against ICAO's current list, its exclusions and the date rules.
  • Authorisation. We map the host-country steps and the corresponding-adjustment path your buyers need.
  • Sourcing. We source eligible units with their evidence. More: CORSIA and Article 6.

Frequently asked questions

Can first-phase units be used for 2027–2029?

Only if they also meet the second-phase rules: an approved programme, eligible vintages, the attestation and, where required, the corresponding adjustment, and no exclusion.

Are A 6.4 ERs eligible?

In November 2026 the ICAO Council conditionally approved the Article 6.4 mechanism for both phases; its registry was not yet operating when it was assessed, and ICAO's technical body will review further information.

Can Indian projects supply units for 2027–2029?

Yes, under an approved programme, if the project is not excluded and India gives the attestation and, where required, the corresponding adjustment.

Sources

  • ICAO, CORSIA Eligible Emissions Units, 14th edition, April 2026, section III (icao.int), read 28-Nov-2026.
  • ICAO, CORSIA Newsletter, October 2026 (with the Council decisions of early November 2026) (icao.int), read 28-Nov-2026.