Grid-connected renewable power no longer qualifies for carbon credits as a matter of course. Eligibility now depends on the programme, the country and the technology, while India's CCTS, Article 6.4 and newer methodologies open other routes. VPA India checks which routes a renewable energy or clean technology project can still take, and develops the project from feasibility to issuance.
Talk to us: WhatsApp +91 8905541120 · Call +91 8905541120 · inquiries@decarbonisation.expert · Send an enquiry (form)
Solar, wind and hydro developers and independent power producers.
Industrial companies investing in energy efficiency, fuel switching or waste heat recovery.
Developers of biogas, compressed biogas and landfill gas projects.
Green hydrogen developers.
Clean cooking and household energy programmes.
India's CCTS. BEE's approved methodologies include grid-connected electricity generation from renewable sources (BM EN01.001), based on the CDM methodology ACM0002. A CCTS project cannot be registered at the same time in another carbon market or market-based mechanism, including renewable energy certificate schemes.
Article 6.4 (PACM). A methodology for grid-connected renewable power is among those adopted; the host country must approve the activity.
Verra (VCS). Verra excluded most renewable energy projects from the VCS when it launched version 4 in 2019. Its revised methodology VMR0017, active since 23 April 2026, extends eligibility for wind, geothermal and land-based solar to countries the World Bank classes as low-, lower-middle- or upper-middle-income; India is classed as lower-middle-income for 2026–27. Projects requesting registration from 1 January 2027 must apply VMR0017 in full.
ICVCM. VMR0017 is the grid renewable methodology with CCP approval; the ICVCM found that ACM0002 and AMS-I.D. do not meet the CCP criteria.
Gold Standard. Under its Renewable Energy Activity Requirements, version 1.4, grid-connected renewables qualify only in least developed countries, small island developing states and landlocked developing countries, or in low- and lower-middle-income countries where the technology supplies less than 5% of the grid's installed capacity. Gold Standard has consulted on a new approach linked to the conditional part of each country's NDC.
Clean cooking. CCP-approved methodologies include Verra's VM0050 and Gold Standard's metered and measured cooking devices methodology; AMS-II.G. does not meet the CCP criteria. Article 6.4 adopted two cooking methodologies in October 2026.
Biogas and manure. Gold Standard's animal manure management and biogas use methodology is CCP-approved, while AMS-I.E. and AMS-I.I. do not meet the criteria. BEE's list includes methane recovery from livestock manure at households and small farms.
Landfill gas. ACM0001 (versions 15 to 19) and AMS-III.G. (versions 9 and 10) are CCP-approved. BEE's list includes landfill methane recovery and the flaring or use of landfill gas, and Article 6.4 has a landfill gas methodology.
Green hydrogen. BEE's list includes hydrogen from the electrolysis of water and from methane extracted from biogas.
Energy efficiency and waste heat. BEE's list includes energy efficiency and fuel switching in industrial facilities. The ICVCM's table lists waste heat recovery methodologies such as ACM0012 as very unlikely to meet the CCP criteria.
Route check. Programme, country, technology, start date, and any existing registration or certificates.
Feasibility. Expected reductions, additionality, and the cost and timing of each route.
Documents. The project design document and monitoring plan in the chosen programme's format.
Validation to issuance. Support through validation, registration, verification and issuance.
A route note comparing the programmes open to your project
A first estimate of emission reductions and credits
Project documents ready for validation
Monitoring reports for each period
Possibly, under VMR0017, if it meets the methodology's eligibility rules, the additionality tests and the transition dates. We check each project against the current version.
Not under India's CCTS offset mechanism, which does not allow registration in another market-based mechanism, including renewable energy certificate schemes, at the same time. Other programmes have their own double-counting rules, so we check them case by case.
They can continue for the rest of their crediting period, but must move to VMR0017 at their next crediting period renewal submitted from 1 January 2027. Verra accepts requests under ACM0002 version 22.0 and AMS-I.D. version 18.0 until 31 December 2026.
Verra, "Verra Publishes Revised Methodology for Grid-Connected Electricity Generation from Renewable Sources", 23-Apr-2026 (verra.org), read 19-Nov-2026.
Verra, VMR0017 Grid-connected Electricity Generation from Renewable Sources (ACM0002 Revision), version 1.0 (verra.org), read 19-Nov-2026.
Verra, "New ICVCM methodology decisions announced" (verra.org), read 19-Nov-2026.
World Bank, World Bank Country and Lending Groups – fiscal year 2027 (datahelpdesk.worldbank.org), read 19-Nov-2026.
Gold Standard, Activity Requirements for Energy Systems and Efficiency (ESE) – consultation (goldstandard.org), read 19-Nov-2026.
ICVCM, CCP assessment status – category table, updated 19-Nov-2026 (icvcm.org/assessment-status), read 19-Nov-2026.
UNFCCC, Article 6.4 mechanism – methodologies (unfccc.int), read 19-Nov-2026.
UNFCCC, "Clean cooking projects gain access to UN carbon market", 09-Oct-2026 (unfccc.int), read 19-Nov-2026.
Bureau of Energy Efficiency, Methodologies and tools under the offset mechanism (beeindia.gov.in), read 19-Nov-2026.
Bureau of Energy Efficiency, Detailed Procedure for Offset Mechanism under CCTS, version 1.0, effective 27-Mar-2025 (beeindia.gov.in), read 08-Nov-2026.
Talk to us: WhatsApp +91 8905541120 · Call +91 8905541120 · inquiries@decarbonisation.expert · Send an enquiry (form)