The project design document (PDD) is the file a carbon project is judged on. It sets out what the project does, where its boundary lies, the baseline, why the project is additional, how the reductions or removals are calculated and how they will be monitored. VPA India writes PDDs and the documents around them in each programme's format, and prepares them for the auditor's review.
Talk to us: WhatsApp +91 8905541120 · Call +91 8905541120 · inquiries@decarbonisation.expert · Send an enquiry (form)
Project owners and developers starting a new carbon project.
Owners whose draft PDD needs rework after an auditor's findings or a programme's review.
Registered projects moving to a new methodology version.
Non-obligated entities registering projects under the offset mechanism of India's Carbon Credit Trading Scheme (CCTS).
Project description. Location, technology, owners, start date and timeline.
Methodology. The methodology and tools applied, with their versions, and how the project meets each applicability condition.
Boundary. The emission sources, carbon pools and gases included and excluded.
Baseline. What would happen without the project, and the baseline emissions.
Additionality. Why the project would not go ahead without carbon revenue, with evidence for each test the methodology sets.
Reductions or removals. Baseline emissions minus project emissions minus leakage, with every input and its source, for each year of the crediting period.
Monitoring plan. The parameters, instruments, frequencies, data flow and quality checks.
Safeguards and stakeholders. Environmental and social impacts, local stakeholder consultation and the grievance route.
Article 6.4 (PACM). The UNFCCC's PDD form for Article 6.4 projects (A6.4-FORM-AC-020, version 01.0), which includes the demonstration of prior consideration; a designated operational entity (DOE) validates it.
Verra (VCS). The VCS project description template; the project description and the first monitoring report can be developed, validated and verified at the same time.
Gold Standard. A fully completed PDD goes to the validation and verification body (VVB), and Gold Standard reviews the VVB-approved PDD for design certification.
Global Carbon Council. The Project Submission Form (PSF), under the GCC Project Standard, version 6.1.
ACR. A GHG Project Listing Form first, then the GHG Project Plan on ACR's template (version 3.2, June 2026).
India's CCTS. The project design document in the Bureau of Energy Efficiency's (BEE) format, with the monitoring plan; an accredited carbon verification agency (ACVA) validates it.
Data request. We list the data and documents the methodology needs and collect them with your team.
Methodology check. We confirm the methodology version and every applicability condition before drafting.
Calculation file. We build the spreadsheet behind the PDD so that every figure can be traced to its source.
Drafting. We write the PDD and its annexes in the programme's current template.
Readiness review. We review the draft the way the auditor will, before validation starts.
Findings. We help you answer the auditor's corrective action requests and clarification requests.
The PDD in the programme's template, with annexes
The emission-reduction calculation file
An evidence list for the auditor
A response log for the validation findings
The project owner submits it. An auditor that the programme accepts – a VVB, a DOE or an ACVA – validates it, and the programme registers the project. VPA India prepares the document and supports you through the review; it does not validate it.
Yes, in most programmes: a grouped project or a programme of activities covers many sites under one set of rules. Some programmes let new sites join over time; India's CCTS allows bundled registration and grouped projects whose make-up stays fixed.
Only within each programme's rules. India's CCTS offset mechanism, for example, does not accept a project registered at the same time in another carbon market or market-based mechanism, so the choice of programme comes first.
The project report, permits, land or site records, technical specifications, energy or production data, and evidence of the start date.
UNFCCC, Project design document (PDD) form for Article 6.4 projects, A6.4-FORM-AC-020, version 01.0 (unfccc.int), read 19-Nov-2026.
Verra, VCS project description and monitoring report (verra.org), read 19-Nov-2026.
Gold Standard, Step-by-Step Guide to the Gold Standard Certification Process, version 3.0, February 2026 (globalgoals.goldstandard.org), read 19-Nov-2026.
Global Carbon Council, Project Standard, version 6.1 (globalcarboncouncil.com), read 19-Nov-2026.
ACR, GHG Project Plan Template, version 3.2, 23-Jun-2026 (acrcarbon.org), read 19-Nov-2026.
Bureau of Energy Efficiency, Detailed Procedure for Offset Mechanism under CCTS, version 1.0, effective 27-Mar-2025 (beeindia.gov.in), read 08-Nov-2026.
Talk to us: WhatsApp +91 8905541120 · Call +91 8905541120 · inquiries@decarbonisation.expert · Send an enquiry (form)