Compressed biogas (CBG) projects: India's blending obligation and carbon credits
Compressed biogas (CBG) is biogas from organic waste, cleaned and compressed so that it can replace natural gas in vehicles, homes and industry. India now requires city gas distributors to buy a rising share of CBG, and projects can also earn carbon credits for the emissions they avoid. VPA India helps plant owners and gas buyers with both.
Talk to us
CBG at a glance
- 2026-273% CBG in CNG and PNG
- 2027-284%
- 2028-295%, and onwards
- Obligation
- City gas distribution entities, as set out on 1 October 2026
- Scale
- More than 217 plants commissioned by August 2026, above 1,700 tonnes per day
- India's CCTS
- No approved methodology for CBG plants as such (read 23 November 2026)
Who it is for
- CBG plant developers and operators.
- Sugar mills, dairies, food processors and municipal bodies with organic waste.
- City gas distribution companies buying CBG.
- Investors and lenders looking at CBG plants.
India's rules
- CBG blending obligation. City gas distribution entities must procure CBG for CNG (transport) and PNG (domestic) at 3% in 2026-27, 4% in 2027-28 and 5% from 2028-29 onwards, as the Ministry of Petroleum and Natural Gas set out on 1 October 2026.
- Scale. The ministry reported more than 217 CBG plants commissioned by August 2026, with installed capacity above 1,700 tonnes per day.
- Carbon credits. The offset methodologies approved by the Bureau of Energy Efficiency include methane recovery from livestock and manure management at households and small farms, and hydrogen production using methane extracted from biogas; its tools include one for project and leakage emissions from anaerobic digesters. No approved methodology is written for CBG plants as such (read 23 November 2026).
What decides the credits
- Baseline. What happens to the waste today – open dumping, burning or lagoons – and the fuel the gas replaces.
- Leakage. Methane escaping from digesters, storage and upgrading reduces the credit.
- Energy. Power and heat used by the plant and by transport are counted.
- Digestate. How the remaining slurry is stored and used.
- Claims. When gas is sold under the blending obligation, contracts must settle who holds the environmental claim.
How we work
- Screening. Feedstock, plant design, offtake and the crediting route.
- Measurement design. Gas metering, methane content, leak checks and feedstock records.
- Documents. The project description, the emission reduction calculation and the monitoring plan.
- Validation and issuance. Support through validation, verification and issuance.
What you receive
- A screening note with a first estimate of emission reductions
- A comparison of the crediting routes open to the plant
- A monitoring plan
- Project documents ready for validation
Track record
From our project list: biogas from manure, India – Verra VCS, 2020.
Frequently asked questions
What is the CBG blending obligation?
An obligation on city gas distribution entities to procure CBG for CNG (transport) and PNG (domestic): 3% in 2026-27, 4% in 2027-28 and 5% from 2028-29 onwards.
Can a CBG plant earn CCUs?
It depends on what the plant does: the approved methodologies cover methane recovery from manure at households and small farms, and hydrogen made from biogas methane. We screen each plant against the current list before any document work starts.
What reduces the credits?
Methane leaks, the plant's own energy use and transport of feedstock and gas.
What do you need from us to start?
The feedstock and its volumes, the plant's design and capacity, and how the gas will be sold.
Sources
- Press Information Bureau, Ministry of Petroleum and Natural Gas, release of 01-Oct-2026 on compressed biogas (pib.gov.in), read 23-Nov-2026.
- Bureau of Energy Efficiency, Approved methodologies and tools under the offset mechanism (beeindia.gov.in), read 23-Nov-2026.
